What Is Cut and Sew? The Two Rooms Behind the Price
Home
Yiwu, Zhejiang, China
Mon – Fri 9:00 AM – 6:00 PM · Sat 9:00 AM – 4:00 PM
[email protected]

What Is Cut and Sew, and What the Cutting Table Decides

Alan Xiao, Founder of Sourcing Pioneer
Alan Xiao Founder, Sourcing Pioneer
· Updated October 30, 2026 · 13 min read

Cut and sew is a garment made from cloth that was cut into pieces and then sewn together. The phrase names two rooms in a factory, not a style of clothing.

Most pages about it describe the business steps: the tech pack, the sample, the minimum. They stop before the cutting table.

This page starts there. It covers the four operations on the floor and how the marker sets the cloth bill. It also covers who buys the fabric, and how a minute price is built.

Those four answers are what separate two quotes for the same drawing. The steps are on every blog. The arithmetic is not.

Studio still life on a flat cream surface showing a folded length of navy cotton, a paper marker with pattern shapes nested on it, a rotary cutter and a bundle ticket, lit softly from the left, with a serif headline reading CUT AND SEW and an amber subhead reading THE TWO ROOMS
Cloth, a marker, a cutter, a ticket. Everything after that is sewing.

The Short Answer

Cut and sew means the garment was built from flat cloth. The cloth was spread on a table, cut to shape, tied into bundles, and sewn.

That is the whole term. It is used to separate this route from two others: printing on a finished blank, and knitting a garment to shape.

A cut and sew garment can hold any measurement you set, because the pattern decides the size. A printed blank cannot, because the blank already exists in fixed sizes.

The industry definition that separates it from knitting puts the same line in one sentence: the garment is sewn from purchased fabric.

That last word is the part buyers miss. Purchased fabric means somebody chose the cloth and paid for it before a needle moved. Which party that is decides the whole contract.

The test is simple. Ask the factory who buys the cloth. If the answer is you, the order is CMT. If the answer is them, it is full package. Neither is better, but they carry different risks.

Four Things Happen on the Floor

Flat vector process panel on a cream background with four numbered stages in a row headed SPREAD, CUT, BUNDLE and SEW, each over a thin amber rule with two short uppercase lines beneath naming what is decided at that stage
Four stages, and the decision each one locks in.

Between the fabric roll and the finished garment, four things happen. Each one is a place where money is either saved or lost.

The cloth is spread. Layers of fabric are laid on a table, one over another, until the stack reaches the planned height. The height is the ply count, and it is set by the cloth, not by the order.

A stable woven can be spread forty plies high. A soft knit, a stripe or a print that has to match at the seam can often take eight or ten. The same order, on a different cloth, needs more cutting time.

The stack is cut. A blade follows the marker through every layer at once. One pass cuts forty garments, or ten, depending on the stack.

The blade is not perfectly vertical, so the bottom layer can drift a millimetre or two from the upper layer. That drift is why a cut garment carries a tolerance. A factory that promises zero variance on a forty-ply stack is promising something the blade cannot do.

The pieces are bundled. Every cut piece is matched into sets and tied with a ticket that carries the style, the size, the colour and the cut number.

The bundle is how a garment is tracked. When a defect appears in bulk, the ticket says which cut and which spread it came from. The check goes back to those pieces, not to the whole order.

The pieces are sewn. A line is a row of stations, each doing one operation, moving the bundle from station to station. The slowest station sets the pace of the whole line.

That is why a small style change can move a delivery date. Moving one seam can add a station, and a station added to a balanced line is a new bottleneck.

The Marker Decides the Cloth Bill

A marker is a long sheet of paper, now usually a file. On it, every pattern piece is laid out to fit the width of the cloth. Its job is to waste as little cloth as possible.

Yield is the share of that sheet covered by pattern pieces. The rest is offcuts. Spend is the number that turns into money, because cloth is bought by the metre.

This is the single largest line in a cut and sew quote, and it is the one buyers never ask about. A quote shows a cloth cost. It almost never shows the yield behind it.

What moves the yieldWhyWhat it does to the bill
How many sizes sit on one markerMore sizes give the layout more shapes to nestA wide size range can cost less per unit than a narrow one
A print or a nap with a directionPieces cannot be turned upside downThe layout loses freedom and the offcuts grow
Stripes or checks that must matchEach piece needs extra cloth to line up at the seamAdds a visible allowance per garment
Cloth widthA narrow roll gives the marker less room acrossThe same pieces need more length
How many extremes are in the rangeThe largest and smallest sizes nest badly togetherThe two outer sizes drag the average down

The arithmetic is easy to follow. Take a style that uses 1.4 metres at 88 percent yield. Hold the garment the same and drop the yield to 80 percent, and the same piece now needs 1.54 metres.

That is ten percent more cloth on every unit, from a decision nobody wrote down. On a run of a few thousand pieces it is the difference between two quotes that were never comparable.

Ask for the yield on the quote, and ask what size ratio the marker was built on. A factory that answers both has costed the order. A factory that answers neither has given you a number for a garment it has not laid out.

Why the Minimum Exists

A cut and sew minimum is not a rule the factory invented to be difficult. It comes out of three physical limits, and the highest of the three becomes the number on the quote.

The first limit is the ply count. A marker is cut in one pass, so a small order means a short stack. The cutting and the spreading take the same time either way, and that time is spread over fewer garments.

The second limit is the roll. Cloth arrives in a roll of a fixed length, and a mill sells by weight. A colour that is not in stock starts at a dye lot, and a dye lot is a weight before it is a garment count.

The third limit is the colour count. Two colours are two spreads and often two dye lots. The total can look healthy while each colour sits under the floor on its own.

This is why arguing about the minimum rarely moves it. The number is set by the stack, the roll or the dye lot, and each of the three is lowered a different way.

One practical consequence: a narrow size range usually reaches the floor sooner than a wide one, because the marker has fewer shapes to nest. Splitting a first order by size is often cheaper than splitting it by colour.

CMT or Full Package: Who Buys the Cloth

Flat vector comparison panel on a cream background with two columns headed CMT and FULL PACKAGE above four paired rows, the left column naming who supplies the cloth, trims, risk and cash and the right column naming the opposite arrangement
Two contracts, one question: who buys the cloth.

Two contract shapes sit under the phrase cut and sew. They use the same floor and the same workers, and they put the cloth risk in different hands.

CMT means cut, make and trim. You supply the fabric and the trims, and the factory supplies the cutting, the sewing and the finishing. The price is labour plus overhead.

Full package means the factory buys the cloth and the trims as well. The price carries the cloth, and the factory carries the risk of buying it.

QuestionCMTFull package
Who buys the clothYou, from a mill or a traderThe factory
Who carries a dye lot that arrives wrongYouThe factory, priced into the unit
What the unit price containsLabour, trims, overheadCloth, trims, labour, overhead, margin
Cash before productionCloth paid up front by youOne deposit, no separate cloth payment
What moves the price after signingA late cloth deliveryThe cloth market, unless the quote is fixed
What you must sendFabric, trims and the specThe spec

CMT is cheaper per unit and riskier in total. You see the cloth cost, you choose the mill, and you keep the saving. You also own every mistake that arrives on a roll.

Full package costs more per unit and is calmer to run. The factory has one number to hit, so it buys the cloth it can work with, and a short roll becomes its problem.

The choice usually follows volume and experience. A first order with no mill relationship is easier as full package. A fifth order with a mill you trust is cheaper as CMT.

Where the purchased-fabric model sits in the wider trade is worth reading once. It explains why the split exists: the mill and the sewing room have long been separate businesses.

How the Minute Price Is Built

A cut and sew quote is four blocks added together. When two quotes for one style differ by a third, the gap is in one block, and the other three can be checked.

BlockHow it is builtWhat moves it
ClothMetres used divided by yield, times the price per metreYield, size ratio, print direction
LabourStandard minutes per garment, times the minute cost of the lineOperation count, seam type, machine type
TrimsA list, priced per unitZip, button, interlining, label, thread
Overhead and marginA percentage on the three blocks aboveOrder size, season, how busy the line is

The labour block is the one that looks like magic and is not. A factory times each operation, adds the minutes for one garment, and multiplies by what a minute costs on that line.

Those minutes have a name. Standard allowed minutes, usually shortened to SAM, is the time a trained worker needs for one operation at normal pace. A basic tee is a small number of minutes. A lined jacket is a large one.

The minute cost is the line’s wage bill divided by the minutes it produces. Two factories with the same wage can hold different minute costs, because one runs a fuller line than the other.

So the labour block answers a question you can actually ask: how many minutes is this style, and what is a minute here? A factory that quotes labour without a minute figure is quoting a feeling.

For a CMT order, the cloth block drops out of the factory quote and moves to your side of the table. That is why a CMT quote looks so much lower, and why it is not a saving on its own.

What to Send Before You Ask for a Price

A cut and sew factory prices a document, not an idea. Five things have to be in it, and four of them are decided before the cutting table is booked.

The drawing. Front, back and one side, with the seams shown. A rendered illustration without seam lines cannot be cut, because the pattern maker cannot see where one piece ends.

The measurements. One size, twelve points, with a tolerance on each. The file that carries those measurements is the tech pack, and without it the factory prices its own block.

The cloth, with a weight. A fibre name is not enough. Cotton jersey at 180 grams per square metre is a product, and the weight is what the mill charges for. What the weight does to the cloth bill is worth reading before the first quote arrives.

The colour standard. A physical swatch, not a screen image, and one per material. A dye house cannot match a monitor.

The contract shape. State CMT or full package in the first message. A factory that assumes the wrong one prices the wrong job, and the mistake shows up after the deposit.

One more item belongs in the message even though it is not a document: the size ratio. It changes the marker, the marker changes the yield, and the yield changes the cloth line before anyone has discussed labour.

Five Defects That Start in the Cutting Room

Most quality problems are blamed on the sewing floor. Five of the common ones start earlier, and no inspection at the end can undo them.

Off-grain cutting. The piece was laid against the grain instead of along it. The garment twists after washing, and one side hangs lower than the other.

Layer shift. The stack moved during the cut, so the bottom layer is a size smaller than the upper layer. It shows up as a tight garment from one cut and a correct one from the next.

Mis-matched pieces. Two panels from different cuts were bundled together, and the seam lines do not meet. The ticket on the bundle is what finds the cause.

Shade bands. Two rolls of the same colour went into one stack, and the difference only shows when the light changes. Splitting a spread by roll is the prevention.

Blade marks. A blunt blade leaves a fused or frayed edge on a synthetic cloth, and the seam fails later at that line.

All five are visible before sewing and invisible after finishing. That is why a mid-production check belongs at the cutting table, not only at the end of the line.

How to check a factory before you send cloth covers the supplier questions that belong at the same stage. What a brand keeps when it pays for the pattern explains who owns the block the marker is cut from.

Some buyers move from a trading company to a direct factory. The wider picture of contract work in China sets out what changes when the middle layer is removed.

Questions Buyers Ask About Cut and Sew

What does cut and sew mean?

A garment made from flat cloth that was cut into pieces and sewn together. The name separates it from printing on a ready-made blank and from knitting a garment to shape. Any measurement can be set, because the pattern decides the size.

What is the difference between CMT and cut and sew?

CMT is one shape of a cut and sew order. Cut and sew names the process. CMT names who supplies what: you buy the cloth and the trims, the factory does the cutting, making and trimming. Full package is the other shape.

What is a marker in cut and sew?

The layout of every pattern piece on the cloth, drawn to fit the roll width. The share of the sheet covered by pieces is the yield, and the yield sets how many metres one garment uses. It is the largest lever on the cloth line.

How many pieces is a cut and sew minimum?

There is no single figure. The minimum is the highest of three limits: the ply height the cloth can be spread to, the length of a cloth roll or dye lot, and the count per colour. Ask which one is binding.

Can a cut and sew factory make a small first order?

Often yes, at a higher unit price. A short run still needs a marker, a spread and a line slot, and those costs do not shrink with the count. Asking for one colour and a narrow size range is what makes a small order workable.

What is standard allowed minutes?

The time a trained worker needs for one operation at normal pace, usually shortened to SAM. A factory adds the minutes for every operation in a garment and multiplies by the minute cost of the line. That product is the labour block of the quote.

The Bottom Line

Cut and sew is not a style. It is four operations on a floor, and the first of them decides most of the cost.

Ask who buys the cloth, ask for the yield, and ask for the minutes. Three answers turn a quote into something you can compare with another one.

FLOOR CHECK

Send the Style and the Cloth

Send the drawing, the measurements and the cloth you have in mind. We will say which contract shape fits the order, ask the factory for the yield and the standard minutes, and tell you which of the four blocks is carrying the difference between two quotes.

Send the Style

Questions & Comments

We read every one and reply within 24 hours

Two quotes for one style that sit a third apart? Tell us the style and the cloth and we will say which of the four blocks is carrying the difference.

Subscribe
Notify of
guest
0 Comments
Most Voted
Newest Oldest
0
Would love your thoughts, please comment.x
()
x