Cable Assembly Manufacturer: The Drawing Decides the Order
A cable assembly is a wire with ends fitted to it, made to a drawing. The shop rarely gets the order wrong because it cannot crimp. It gets it wrong because the drawing left a choice open, and the line made that choice for you. Where the five fields belong is the document that stops it.
The Short Answer
Five things on the drawing decide the whole order. The wire, the terminal, the housing, the length with its route, and the test.
Leave any one of them open and the shop fills the gap with what it has in stock. That is not dishonesty. It is how a line keeps moving.
So a good order is not a longer order. It is a drawing that names five things, plus a sample that proves the line can hit them.
Ask for the sample to be made on the production tool, not by hand. A hand sample proves the design works. Only a tool sample proves the line can repeat it.
What a Cable Assembly Is, and What It Is Not
Three words get used for the same thing, and the price moves with the word. A cable is the wire on its own. An assembly has ends fitted to it. A harness is several assemblies joined into one part.
The difference matters at the quote. Cutting and stripping wire is a cheap job. Fitting a terminal, sealing it and testing it is not.
A harness adds a third layer of work. Several branches, a common break-out point, and a label that tells the installer which end goes where.
Most first orders are assemblies, and most first orders fail at the two ends. The middle of a cable rarely goes wrong. The place where copper meets a terminal is where the money is lost.
That is why this article spends most of its length on ends, and very little on the wire itself.
The Five Fields a Drawing Has to Fix
A drawing that carries five fields can be quoted, built and checked. A drawing that carries three can only be guessed at.
The wire field names the conductor size, the insulation material, the colour and the temperature rating. A shop that is told only the colour will use whatever it has in stock.
The terminal field names the part, and the part number is not enough. It also names the plating and the crimp height that the applicator is set to.
The housing field names the connector, the keying and whether a lock or a seal is fitted. Two housings that mate look alike and do not interchange.
The length field gives a length with a tolerance, and a route if the cable bends. A length without a tolerance is a length nobody can fail.
The test field says what is checked on every piece, and what is checked on a sample. That line is the one buyers leave blank most often.
| Field | What it must state | What goes wrong without it |
|---|---|---|
| Wire | Gauge, insulation, colour, temperature rating | Whatever the shop has in stock that week |
| Terminal | Part, plating, crimp height | A crimp that pulls out under load |
| Housing | Connector, keying, lock or seal | A part that will not mate on site |
| Length | Length with tolerance, and the route | A cable that is 20 mm short in a panel |
| Test | Every piece, or a sample, and which test | A short that reaches the customer |
The Crimp Is the Whole Job
A crimp is a metal barrel pressed around bare copper. Done right, the copper and the barrel become one piece of metal. Done badly, they touch and slowly stop touching.
Two settings decide it. How far the tool presses, and how far up the barrel the copper sits. Both are set on a tool, and the tool is matched to one terminal family.
This is where a cheap order and a good order part company. An applicator set for one terminal will not crimp another correctly, even when the two look the same from a metre away.
Ask which applicator the line will use, and ask for the pull test result on the first pieces. The pull test pulls the terminal until it lets go, and the number is recorded in kilos or newtons.
A shop that quotes a pull force without being asked is a shop that measures it anyway. That is the answer you are looking for.
The second half of the same question is who owns the tool. If the applicator is bought for your terminal, it should stay with the job. A tool that walks away takes the order with it.
The clause that names the tooling owner is short, and it is worth writing before the sample is approved.
Terminals, Plating and the Mating Side
A terminal has two ends in one part. One end grips the copper. The other end meets the pin or the tab on the other side of the connection.
The mating side wears. Every plug and unplug takes a little metal off the plating, so the plating and the contact shape decide how many cycles the joint survives.
Ask for the cycle count the connector is rated to, and ask where that figure comes from. A figure taken from a catalogue page is fine, as long as the part on the drawing is the part in the catalogue.
Plating is the field most often left off a drawing. Tin is cheap and oxidises. Gold costs more and keeps a low resistance after many cycles. A mix of the two on one connector is a corrosion cell waiting for humidity.
One more part is worth naming. Many housings take a small plastic lock that holds the terminal in place. It costs almost nothing and it prevents the fault a customer finds by pulling on the wire.
Length, Route and the Bend Nobody Draws
Length looks like the easy field and it causes the most rework. A cable that is short cannot be fixed in the field. A cable that is long can be looped, at a cost in appearance and strain.
So the drawing gives a length and a tolerance on it. Both ends are measured from a fixed point, and the fixed point is named. Measuring from a connector tip and measuring from the back of a housing gives two different cables.
If the cable bends inside an enclosure, the drawing carries the route. A route adds length around each corner, and it sets the smallest radius the cable may take.
A tight bend does two bad things. It presses the inner wires against each other, and it works the strands at the crimp. The second fault shows up as a broken conductor inside intact insulation, which is the hardest fault to find.
Ask one question about the route. Does the drawing show the bend radius, or does it leave that to the installer. If it leaves it, the installer decides how long your cable lasts.
Tie points belong on the same page. A harness with three branches needs to know where they are held. A branch that floats pulls on its own terminal every time the machine moves.
Three Tests, and What Each One Costs
Testing a cable is cheap compared with testing a board, and it is still the field buyers leave blank. Three tests cover almost every fault.
The first is continuity. A fixture touches both ends and confirms that each conductor reaches the right pin and no other. This catches a crossed wire, a broken strand and a wrong terminal position.
The second is a high pot test, which pushes a high voltage between conductors and between a conductor and the shield. It finds insulation that is thin, pinched or damaged by a crimp.
The third is the pull test on the terminal, already described. It is the only test that looks at the joint the customer will pull on.
Ask which of the three runs on every piece. Continuity on every piece is normal. A high pot test on every piece is common for mains cables and rare for signal cables.
Then ask what the fixture does when it fails a piece. A lamp and a reject bin is enough, as long as the piece is marked and the count is written down.
How a pull test is witnessed describes what a visit can add. The value is not the test itself. It is watching the operator run it the way the work instruction says.
Sealing, Strain Relief and the Overmould
A sealed assembly is a different product from an open one, and the price gap surprises buyers. The gap comes from tooling and from time, not from the plastic.
An overmould is plastic shot around the joint. It holds the cable and the housing as one part, which is what strain relief means in practice.
The mould needs a tool cut for the shape. That tool is a one-off cost, and it is the reason a sealed assembly has a higher entry price than an open one.
Sealing is a separate claim from moulding. A moulded end can still leak at the joint face. If the part must keep water out, the drawing names the level it must hold and the test that proves it.
Ask how the seal is checked. A sample put in water is a start. A sample held under pressure with a gauge is a result.
One detail belongs in the same conversation. The tool for the mould is yours if you pay for it, and the order should say so. Otherwise a second order goes back to the same shop at whatever price it sets.
The Nine Lines a Quote Has to Carry
A cable quote can hide the whole job in one unit price. Nine lines pull it apart far enough to compare two shops.
| Line | What it has to say |
|---|---|
| Drawing | The revision number, and the date it was agreed |
| Wire | Gauge, insulation, colour, and the maker of the wire |
| Terminal and housing | The part numbers, the plating, and who buys them |
| Crimp | The applicator, the crimp height, and the pull force |
| Length | The length, the tolerance, and the point it is measured from |
| Seal or mould | Whether it is sealed, to which level, and who owns the tool |
| Test | Which tests run on every piece, and which on a sample |
| First article | How many pieces, who approves them, and what a fail means |
| Lead time | Split into parts waiting, cutting and crimping, and test |
Two of these lines decide whether a second order is easier or harder. The drawing revision line and the tooling line.
A revision number means the shop cannot build last month’s version by accident. A tooling line means the second order does not start with a new tool quote.
The rest of the lines protect the first order. They turn a price into something you can check a sample against.
Ask for the same nine lines from every shop you approach, in the same order. A comparison of two prices is useless. A comparison of two sets of answers is a decision.
The First Article: Where the Order Is Really Agreed
A first article is a small batch made on the production line and checked against the drawing before the rest runs. It is the cheapest control in the whole order.
Ask for three things with it. The pull test numbers, the continuity report, and the measured lengths. Those three cover the faults that a photo cannot show.
Then check the sample against the drawing yourself. Put a caliper on the length and pull on a terminal by hand. If a terminal moves, stop the order there.
A hand sample made before the tooling exists proves the design. It does not prove the line, and this is the gap buyers fall into most often.
The same crimp logic on a consumer cable is worth reading next, because the part is simpler and the failure is easier to see.
Seven Faults, and the Field That Prevented Each
Almost every cable fault traces back to a blank field on the drawing. Here are the seven that turn up most, and the line that stops each one.
A terminal pulls out. The crimp height was never set for that terminal, or the applicator was set for a different one. The field that prevents it is the crimp height on the drawing.
A wire breaks inside intact insulation. The bend radius was left to the installer, and the strands worked until they let go. The field is the route.
A connector will not mate on site. The keying or the housing part was not named, and a lookalike was used. The field is the housing.
A cable is short by a few millimetres in a panel. The measuring point was not agreed, so both sides measured honestly from different places. The field is the tolerance and the datum.
A unit fails a safety check at the customer. The high pot test was skipped because nobody asked for it. The field is the test.
Water reaches the contacts. The assembly was moulded, and moulding was treated as sealing. The field is the level and the test that proves it.
The second order costs more than the first. The tool was bought for the job and stayed with the shop. The field is the tooling line in the quote.
What the Cluster Gives You, and What It Hides
Cable work for export sits in the same electronics belt as board work, with a second group of shops inland where labour is cheaper. Wire, terminals and housings are all within a day of each other.
The advantage is speed on a change. A terminal swapped on a Tuesday can be in the sample by Friday, because the distributor is down the road.
The thing the cluster hides is who actually crimps. Many offices quote, sample and ship, and a smaller workshop does the work.
That is normal in this trade. It becomes a problem when a fault is found later and nobody can name the line that ran it.
Three questions make the layer visible. How many crimp machines do you run. Do you cut and strip in house. Who owns the applicators.
A shop that crimps answers with machine counts and tool numbers. A shop that outsources answers with a delivery date.
What the parts market in Shenzhen looks like explains why terminal supply runs so deep. A part can be found in an afternoon.
The Marks on the Wire, and the Code on the Entry
Two kinds of paper sit behind a cable order, and buyers often think one covers the other. One is the safety listing. The other is the import code.
Wire and connectors that carry a recognised safety mark are listed parts. An assembly built from listed parts can be listed too, and the listing follows the parts and the process, not the shop’s promise.
The body behind the UL mark keeps those listings. The useful request is the file number for the exact part on your drawing.
A file number is checkable. A logo on a datasheet is not. Ask for the number, then check it against the part, and do it before the first batch.
The import code is a separate question with its own cost. A length of insulated wire and the same wire with connectors fitted do not sit in the same place in the tariff.
The US tariff schedule is where the difference is set, and the rate follows the code the importer declares. Getting it wrong is a cost that arrives months after the goods.
So the order carries two numbers besides the price. The listing file number and the code the broker will use. Both are free to ask for and both are hard to fix later.
Substance rules sit alongside them. If the goods go to Europe, the parts need statements that show what is in them. Those statements come from the part makers, not from the shop that crimped.
Questions Buyers Ask About Cable Assemblies
What is the difference between a cable and a cable assembly?
A cable is the wire. An assembly has ends fitted, tested and labelled. The fitting and the test are most of the work and most of the risk.
What is crimp height, and why does it matter?
It is how far the tool presses the barrel around the copper. Too little and the joint is loose. Too much and the strands are cut. It is set on the tool, per terminal.
Can the factory make a sample before I pay for tooling?
Usually yes, and it will be made by hand. Treat it as a design check. It does not show what the production tool will do.
What test should every piece get?
Continuity on every piece, because it catches the crossed wire and the missing strand. A high pot test on every piece if the cable carries mains voltage.
Who owns the mould and the applicator?
Whoever pays for them, if the order says so. Put it in writing. Without that line, the second order starts with a new tool quote.
How do I classify a cable assembly for import?
The schedule separates bare wire from wire with connectors fitted. Let the broker name the code, then check the description against the drawing.
The Bottom Line
A cable order is decided before the first metre of wire is cut, in five fields and one sample.
Name the wire, the terminal, the housing, the length and the test. Make the sample on the production tool. Then the price is the only thing left to argue about.
Send the Drawing
Send the drawing, the annual volume and the connector part numbers. We will mark which of the five fields are blank, ask the shop for the crimp height and the pull force, and check whether the sample came off the production tool.
Send the Print
Questions & Comments
We read every one and reply within 24 hoursApproved a sample and then a batch arrived that would not pull the same? Tell us the terminal and the pull force you were shown. We will say which field on the drawing left it open.